Quote:
Originally Posted by westom
Every wire inside every incoming cable must make that short connection to earth before entering. You reroute any cable that does not.
A problem created because too many installers only understand code; do not learn what is also required for surge protection. A utility explains how to kludge a solution only if the superior solution cannot be implemented. How to enlarge a single point ground so that every incoming wire still makes that necessary short connection:
http://www.duke-energy.com/indiana-b...ech-tip-08.asp
|
I'm saying that there is no physical way to "make that short connection" that you are referring to. Something tells me I'm not the only one, either.
And I am sorry, but I don't understand what your second paragraph says.