Per your posted TVFool plot, northwest.
I'm most interested about the specifics of your experience with the DB2e as your description of your results is very much out of character with all reasonable expectations. Failure to identify what might have gone "wrong" is important in the event that some mistake was made or fault overlooked. Failure to resolve something like that will usually mean a repeat failure.
Last edited by ADTech; 30-Jan-2014 at 10:49 PM.
|