Did you have a licensed electrician do the subpanel work? Did you tell him you'd be running a low voltage circuit with a ground back to the main structure?
Yes, a licensed electrician did the work. And no, I didn't tell him about a low voltage circuit. My plans for the antenna were not finalized at the time the electrical work was done. As the OP said, I'm not even sure if I should run the low voltage ground back to the main structure.

If you don't mind, would you please provide some background as to why those two questions are relevant? Just wondering if there's something I could have done better.