View Single Post
Old 15-May-2012, 11:26 AM   #3
AtLarge
Junior Member
 
Join Date: May 2012
Posts: 17
Great. I'll just add a piece of that #10 copper wire to the first distribution block of the OTA system and attach it to the same ground clamp that the cable line uses on the conduit. Otherwise, yes, the two systems are completely separate. Thanks GroundUrMast!
AtLarge is offline   Reply With Quote